The short version
- Only C1 and C2 items need remedial work; a C3 is a recommendation landlords don't have to follow.
- A landlord's 28 days run from the inspection date, not the day the report arrives.
- Any qualified electrician can do the work; it needn't be the one who wrote the report.
- Tenants and the council get written proof within 28 days of the work being finished.
- Treat an FI as a 28-day job until the draft amendment due on 30 November 2026 is made.
EICR remedial work means fixing every C1 and C2 fault on the report, which a landlord in England must have done within 28 days of the inspection. A qualified person does the work, the report can set a shorter deadline, and the tenants and the council then get written proof.
Which EICR codes need remedial work?
Only two codes on an EICR call for repairs: C1 and C2. Since 15 October 2026, when Amendment 4 became the only current wiring regulations, they're also the only codes that fail a report.
| Code | What it means | Landlord in England | Homeowner |
|---|---|---|---|
| C1 | Danger present: immediate remedial action | Fix within 28 days, or the shorter period on the report | Make it safe now |
| C2 | Potentially dangerous: urgent remedial action | Fix within 28 days, or the shorter period on the report | Fix it urgently |
| FI | Further investigation advised | Investigate within 28 days (see the 30 November change below) | Have it looked at |
| C3 | Improvement recommended | No duty to act | Your choice |
The government's guidance for landlords is plain about the lowest code:
"The C3 code does not indicate remedial work is required, but only that improvement is recommended." GOV.UK, Electrical safety standards guidance, 1 November 2025
What each code means in detail is in our guide to what an EICR report and its codes mean. If your report lists items that need work, our EICR team can price the remedial work from the report.
The 28-day clock starts on the inspection day
Regulation 3 of the 2020 regulations counts the remedial deadline from the inspection and test, not from the day the report arrives. A report that reaches you a week after the visit leaves three weeks, not four. Here is how the dates fall from a single inspection:
- On day 0 the electrician inspects and tests the installation.
- By day 28 each existing tenant has a copy of the report.
- By day 28, or sooner if the report says, the remedial and investigative work is finished.
- If the council asks in writing, it gets a copy of the report within 7 days.
- Within 28 days of finishing the work, written confirmation and the report go to each tenant and the council.
What counts as proof the work is done
The proof is written confirmation from the qualified person who did the work. The guidance lists what's acceptable: a satisfactory EICR, an Electrical Installation Certificate, or a Minor Electrical Installation Works Certificate. When we do the remedial work, we sign that confirmation for our own work.
Can a different electrician do the remedial work?
Yes. The regulations ask for the work to be carried out by "a qualified person", meaning someone competent to do the inspection and testing. They don't say it has to be the electrician who wrote the report, so you can get a second price. Send us the report and we'll price the remedial work from it.
Whoever does it signs the written confirmation for their own work. On reports we write, we quote remedial work separately once the report is written. We're NICEIC approved.
Common remedial items and what they cost to put right
Electrical Safety First's guide to EICR codes lists the findings inspectors code as C2. These are some of the ones a rented home turns up, with the usual fix and our guide price for it, including VAT:
| C2 finding | Usual fix | Our guide price |
|---|---|---|
| No RCD for sockets likely to feed equipment used outdoors | RCD protection added, sometimes with a new consumer unit | new consumer unit from £400 |
| A loose connection showing signs of overheating | Connection remade, damaged socket or switch replaced | from £80 |
| Signs of excessive heat, such as charring | Cause traced (fault finding from £100); the repair is priced after | from £100 for the tracing |
| Incorrect polarity at a socket, switch or light | Reconnected, or the accessory replaced | from £80 |
A circuit that can't be made safe is rewired instead, and our guide price for a partial rewire is from £2,000. These are guide prices, not a quote. We price your report once we've read the observations. A board change follows the testing steps in our guide to what a consumer unit replacement costs.
FI codes and the change due on 30 November 2026
FI used to fail a report. Under Amendment 4, NICEIC explains, an FI no longer makes the installation unsatisfactory, and its wording dropped "without delay". The law for landlords hasn't caught up yet, so the wiring standard and the landlord regulations currently treat FI differently.
What the draft amendment would change
The 2020 regulations still require further investigative work within 28 days, and the current guidance says the same. A draft amendment would remove that duty from 30 November 2026, and update the standard to BS 7671:2018+A4:2026. On 16 November 2026 it was still marked as not yet made.
Even if it's made, the draft says the change won't apply to inspections completed before 30 November 2026. An FI on an earlier report stays a 28-day job. On reports we write, we quote any FI investigation separately once the report is written.
What happens if remedial work isn't done in time?
The council can act. Under the guidance, a council with reasonable grounds must serve a remedial notice. It can also arrange the work itself and recover the cost, or arrange urgent remedial action with the tenant's consent. It can also impose a financial penalty of up to £40,000. Our guide prices above let you budget the work before the deadline runs out.
When a tenant won't give access
If a tenant won't let the electrician in, the guidance says you aren't in breach just because you haven't taken them to court. Keep copies of every message about access. When access is agreed, call us on 07727 619854 to book the work.
Homeowners have no deadline, but C1 still means today
Owner-occupiers have no legal deadline for remedial work. Electrical Safety First suggests an inspection every 10 years for an owner-occupied home. Where dangerous conditions are found, it says remedial action is needed without delay. A C1 means acting straight away. The code guidance tells the inspector not to wait for the full report before saying so.
An EICR from us costs from £120 for a one-bedroom flat, including VAT, with any remedial work priced separately. Landlords can book the next inspection through our landlord EICR service in East London. Our guide to how often an EICR is needed sets out the intervals.
For EICRs and remedial work across London, see our EICR and electrical safety testing page or call 07727 619854.
Frequently asked questions
A new EICR isn't needed after remedial work: the official guidance accepts an Electrical Installation Certificate or a Minor Electrical Installation Works Certificate as proof. A satisfactory EICR also counts as proof.
We quote EICR remedial work separately once the report is written. Our guide prices start from £80 for replacing a socket or switch and from £400 for a new consumer unit, including VAT.
A council can ask a landlord for a copy of the EICR in writing, and the landlord must supply it within 7 days of the request.
A landlord whose tenant refuses access for EICR remedial work isn't in breach just because they haven't taken the tenant to court, the government's guidance says. Keep copies of every message about access as evidence of the steps you took.